All You Need to Know About Sonoma County Building Permits
Most construction projects require planning permissions. That's getting the go-ahead to go through with construction work. You submit a plan and wait for either approval or refusal (based on the planning's adherence to local safety regulations).
The Permit & Resource Management Department manages land development and construction permissions and reviews and inspection of plans. It's a production that requires a series of documents. Working through the red tape can be taxing. Your project can also be subject to considerable fines if you do not have the right planning permissions.
DoNotPay is a great way to navigate the planning permission process. We make sure all the paperwork gets to the right hands, schedule all appointments, and make sure you adhere to the varying factors that can affect approval.
When Is a Building Permit Necessary in the County of Sonoma?
These are the most common conditions where you need . Take note, planning permissions do not always have to be permanent structures.
- You're building new, adding on, or you have a significant construction project.
- The project involves concession stands, press boxes, permanent greenhouses, toilet facilities, the building of storage or utility units, storage rooms, dugouts, guard booths, or similar structures.
- The plans include piers, footings, concrete slabs, or foundations. These are often grandstand or bleacher projects.
- Structures consist of bandstands, pavilions, or membrane structures.
- Any outdoor lighting site that requires and supports an electrical hookup, including scoreboards and field lighting.
- Small projects that impact safety and health. That includes new or renovated fire and safety conditions, means of egress, and mechanical and/or electrical systems.
- Playground construction or renovation.
- Construction or renovation that involves irrigation.
- Safe demolition of existing structures.
- Projects that involve footings, retaining walls, grading, drainage, or walkways.
- Site development in conjunction with a construction project.
3 Reasons to Get a Building Permit in the County of Sonoma
Here's why you do not want to go into a project with the right planning permissions.
1. You safeguard property value. Having a home or business is a major investment and if you want to maintain its value, permits ensure you comply with the codes and regulations for your community. Having permissions ensure insurance companies are more likely to provide coverage. Permits also prevent your project from getting fined.
2. You save money. You want to safely insure the project. Without permissions, you may not get coverage for work, injuries, or damage inflicted by the project.
3. Makes selling or renting easier. Owners are legally required to disclose repairs and improvements and, if asked, to provide inspection and permit certification. You'll be ineligible for most financial support without proof of final inspection. Selling or renting even portions of the structure is going to be a hard sell. Without permits, your modifications could be illegal and subject to removal, fines, and more costly renovations.
How to Get a Building Permit in the County of Sonoma Steps for obtaining planning permissions include:
- A permit application.
- A site plan. This may mean hiring an engineer or architect who can adhere to building and zoning codes for extensive projects.
- You need to supply the cost of the project.
- Scheduling an appointment to get approval (this may happen in-office or on-site).
- Getting permission before you begin any work.
- Scheduling regular inspections throughout construction to verify you follow submitted plans.
- Upon completion, obtain the county's final approval.
What Fees Are Associated With Getting a Permit?
Building permits and plan review fees can include the following.
Plan Review Fees | Plans have to comply with California Building Standard Codes. Fees are due with the application. The charge will be either 75 percent of total permit charges or whenever the Egress or Life/Safey's is expected. That's 100 percent of total permit surcharges and fees with a $155 minimum. |
Building Permit Charges | Fees for planning permissions are payable when issued. A five percent tech fee gets assessed for permits. Any utility work — plumbing, mechanical, electrical — is not generally subject to surcharges. There are state-mandated CBSC and SMIP fees. |
Fire Sprinkler and Alarm and Hazardous Material Permits | All applications and plans go to the Permit Center for review by proper authorities to look for compliance with all fire and hazardous material regulations. |
Development Charges | Development fees come with new projects if a change has had a significant impact on the overall project before issuance. Fees get paid at the current rate when the Building Permit Issuance is provided. |
Solve Getting Planning Permissions With the Help of DoNotPay
If you want to apply for a building permit through a hassle-free process in the but don't know where to start, DoNotPay has you covered.
- Go to the Planning Permissions product on DoNotPay.
- Choose one of the following options:
- Check whether your project needs a building permit or if it's exempt
- Generate a permission request letter to send to your HOA
- Generate a guide on how to complete the building permit application
- Choose the focus of your project (new ADU, pool, shed, fence, etc.) and answer a few questions about your plans, including the size of the structure and estimated cost.
- Indicate whether you're hiring a contractor and include the estimated start date and the timeline for the project.
- Indicate whether any public sidewalk/street space will be used during construction.
- And that's it! DoNotPay will help guide you through the building permit process by checking if your project needs a building permit, contacting any HOAs you're a part of to request building permission, or generating detailed instructions on how to start and complete your building permit application process.
Why Use DoNotPay to Get Planning Permissions in the County of Sonoma County
When you use DoNotPay for planning permission, you eliminate the struggle of an involving, tedious process of potential lines, forms, and tracking. You avoid missteps that even the most experienced contractor, let alone the novice homeowner, may trip over.
DoNotPay can streamline and sidestep all the grief and stress. Our team provides fast and easy progress that saves you hours and ensures you get everything you need to go through with your project.